从泥浆泵房到鹅颈管的完整高压井控管网系统。
高压井控管网系统的设计、工程、供应、安装和调试。
主要特点
- Mud pump to gooseneck coverage
- Pre-fabrication and rig installation
- Trained offshore/onshore teams
- NDT and X-ray capability
- PWHT equipment
- Full certification package
标准与合规
- API 6A
- ASME Section IX
设计流程
- 1Final drawing and bill of material per customer comments
- 2Final design submission to customer for approval
- 3Pre-fabrication after design approval
- 4Testing, inspection and TPI witness at JVS
- 5Depute team of engineers, welders, fitters with NDT, X-ray, and PWHT equipment
- 6Installation and pressure testing at rig
- 7Submission of certificate package and warranty/guarantee certificate