Complete high pressure well control pipe networks from mud pump room to gooseneck.
Design, engineering, supply, installation and commissioning of high pressure well control pipe networks.
Key Features
- Mud pump to gooseneck coverage
- Pre-fabrication and rig installation
- Trained offshore/onshore teams
- NDT and X-ray capability
- PWHT equipment
- Full certification package
Standards & Compliance
- API 6A
- ASME Section IX
Design Process
- 1Final drawing and bill of material per customer comments
- 2Final design submission to customer for approval
- 3Pre-fabrication after design approval
- 4Testing, inspection and TPI witness at JVS
- 5Depute team of engineers, welders, fitters with NDT, X-ray, and PWHT equipment
- 6Installation and pressure testing at rig
- 7Submission of certificate package and warranty/guarantee certificate